guarantees the steadiness and regularity of the key operate of components.
Resources |
one. steel:Aluminum/Metal/Alloy metal/Stainless metal/Brass,copper,bronze etc. two. plastic: Abdominal muscles,POM,PE,PP,PVC,Pc,PMMA,Teflon,nylon and so on. 3. other folks: carbon fiber, glass,fiberglass, wooden, hard rubber and so on. |
Shade |
Silver, Gray, Black ,Gold or as client’s necessity |
Area Roughness |
Ra0.4 ( without polishing or grinding) |
Logo Method |
laser engraving, CNC engraving, monitor-printing etc. |
Surface Finish |
Anodize sharpening zinc/nickel/cEPG specializing in the manufacture of rotocultivator ploughshares and other non-standardized farm equipment cutting tools. hrome/gold plating, sand blasting, ect. |
Tolerance |
+/- .01–.05mm / can also be custom-made |
Certificate |
ISO9001 SEPG |
Processing equipments |
CNC machining middle,NC lathe, Grinding machine, Automatic lathe device, Conventional lathe equipment,Milling equipment,Drilling equipment,EDM,Wire-slicing equipment,CNC bending equipment etc |
Tests device |
Coordinate measuring equipment,Image measuring instrument,Caliper and many others |
Software |
Precision Healthcare Instruments/Electronic/ Industrial// Automation / motorcycle/3D printer |
Market |
Janpan,Korea, Europe,United states of america,CA.AU,Southeast Asia…. |
Provider |
OEM,ODM or as client’s necessity |
Packaging & Delivery
Packaging Specifics
1. interior packaging: plastic wrap, bubble bag, PE foam, EPE cotton,PP bag and so forth.
two. outer packaging: carton box, wood scenario, plate and many others.
3. as for each customers’ need
Port
xiamen, or as client’s need
Guide Time :
Quantity(Pieces) | one – 20 | 21 – 100 | 101 – 1000 | >1000 |
Est. Time(times) | 5 | 10 | 25 | To be negotiated |
Trade Conditions | FOB, CIF, EXW |
MOQ | 1Pcs |
Port | xiamen, or as client’s prerequisite |
Shipping and delivery | By air (DHL,UPS,Fedex,EMS and so on.),By Sea,Convey… |
Payment Approach | T/T(lender transfer),L/C,paypal,western union, moneygram,escrow, cash and so forth |
Payment Phrases | 50% prior to generation, 50% just before shipping and delivery |
Packing | internal box,numerous containers/master carton or as customer’s prerequisite |
Shipping time | 5-7days for Alanple time,five-twenty five times for production |
Comments